Data teams ask us one question more than any other: if our events already live in Frostline, why does Plotline keep its own copy? Why not query the warehouse directly, the way warehouse-native tools do?
The short answer is speed and cost. The longer answer is that we tried it, measured it, and chose a different shape: Plotline computes funnels and cohorts on its own engine and writes the results to your warehouse as plain tables, every five minutes. This post explains the trade.
What we measured#
In early 2026 we ran the same workload two ways for 14 design partners sending between 200 million and 2 billion events a month. One prototype queried the warehouse live for every chart. The other is the sync that shipped in 3.8.
| Median across 14 partners | Live queries | Five-minute sync |
|---|---|---|
| Chart load, median | 6.8 s | 0.4 s |
| Chart load, p95 | 31 s | 1.2 s |
| Warehouse credits a month | 1,840 | 212 |
| Data freshness | Real time | 5 min |
| Works while the warehouse is paused | No | Yes |
Live queries win on freshness, by five minutes. They lose on everything a product manager notices. A five-step funnel broken down by plan becomes a join over hundreds of millions of rows, and it runs again every time anyone opens the chart.
Caching helps less than you would expect. Product teams change filters constantly, so most chart views are a query nobody has run before. In the prototype, only 23% of views hit a warm cache, and the slowest charts were exactly the ones opened in Monday reviews.
Why five minutes#
Freshness is a budget, not a virtue. Most product decisions do not change in five minutes, but some workflows break with a twelve-hour delay: an alert on a failed onboarding step, a customer-success call that needs today's activity, a launch dashboard on launch day.
| Nightly export | 12 to 24 h |
|---|---|
| Hourly batch job | 60 min |
| Plotline sync | 5 min |
Before the sync, teams exported events nightly and rebuilt their models in the morning. Analysts learned to distrust any number from the same day. With a five-minute cadence, the tables in the warehouse and the charts in Plotline agree within one sync, and nobody has to ask which one is right.
What lands in your warehouse#
The sync writes five tables to a schema you choose. They are designed to be joined, not decoded.
-- One row per event, partitioned by day
plotline.events (event_id, account_id, user_id, name, properties, ts)
-- Current state of every account and every seat
plotline.accounts (account_id, plan, seats, created_at, traits)
plotline.users (user_id, account_id, first_seen, last_seen, traits)
-- Results Plotline has already computed
plotline.funnel_steps (funnel_id, account_id, step, reached_at)
plotline.cohorts (cohort_id, account_id, week, active, active_seats)The last two tables are the point. Your dbt models can join funnel_steps to revenue without re-implementing funnel logic, and the numbers match the chart the product manager is looking at.
What it costs#
Writes are cheap; scans are not. Appending five minutes of events and upserting the changed rows of two result tables costs a median of 212 credits a month on Frostline for a workspace sending 50 million events. Kestrel, at 1.9 billion events a month, pays about 1,100 credits for the sync, less than the homegrown job it replaced cost in compute alone.
When to query live anyway#
There are cases where live queries are right. If some events are generated inside the warehouse, from a billing system or a CRM sync, they never pass through our SDKs. For those, Plotline reads a table you point it at, on a schedule you set, and treats it as an event source in funnels.
What we avoid is making every chart a warehouse query by default. Product analytics is used by people who open ten charts in a meeting and expect each one to load before they finish their sentence. A five-minute delay is invisible to them. A thirty-second spinner is not.
Setting it up#
- Create a service user and an empty schema in Frostline, Quarry, Loomhouse or Redwood.
- Paste the connection in Settings → Warehouse and pick the tables to sync.
- The first backfill runs in the background. After it, each sync takes under a minute.
- Point your dbt sources at the
plotlineschema and delete the export job.
Most teams finish in under an hour. Kestrel moved 1.9 billion events a month off its own pipeline in nine days, with both pipelines live until the numbers matched to the row.